Due to maintenance work Mega Block on 8 February 2015

Central Railway will operate Mega Block o­n its suburban sections for carrying out maintenance work o­n 8.2.2015.

Main Line:

Mulund-Matunga Up Slow Line From 11.15 AM TO 3.15 PM

All UP slow line services leaving Thane from 10.41 am to 3.12 pm will be diverted o­n Up fast line between Mulund and Matunga stations halting at Mulund, Bhandup, Vikhroli, Ghatkopar, Kurla  and Sion stations and further re-diverted to Up slow line at Matunga station.  Up slow line services will not be available at Nahur, Kanjurmarg and Vidyavihar.  Passengers of these stations are permitted to travel via Bhandup, Vikhroli and Kurla stations

Down fast line services leaving Chhatrapati Shivaji Terminus from 10.08 am to 2.42 pm will halt at Ghatkopar, Vikhroli, Bhandup and Mulund stations in addition to their respective scheduled halts and arrive destination 20 minutes behind schedule.

Up fast line services leaving Thane from 10.46 am to 3.28 pm will halt at Mulund, Bhandup, Vikhroli, Ghatkopar and Kurla in addition to their respective scheduled halts and will arrive destination 15 minutes behind schedule.

All Down and Up slow line services leaving/arriving Chhatrapati Shivaji Terminus between 11.00 am and 5.00 pm will arrive destination 10 minutes behind schedule.

Harbour Line:

Panvel-Nerul Up And Dn Harbour Lines From 11.00 Am To 3.00 Pm

Up Harbour line services towards Chhatrapati Shivaji Terminus Mumbai leaving Panvel from 10.43 am to 3.27 pm will remain suspended between Panvel and Nerul and Dn Harbour line services to Panvel leaving Nerul from 10.41 am to 3.17 pm will remain suspended between Nerul and Panvel.

Up Transharbour line services towards Thane leaving Panvel from 11.05 am to 3.19 pm will remain suspended between Panvel and Nerul and Dn Transharbour line services from Thane to Panvel leaving Nerul from 11.42 am to 2.48 pm will remain suspended between Nerul and Panvel.

Panvel – Andheri services will remain cancelled during the block. However, special local trains will run o­n Chhatrapati Shivaji Terminus Mumbai– Nerul and Thane – Nerul sections during the block period.

Due to these blocks, suburban trains are likely to be more crowded than usual. Passengers are requested not to take any risks while travelling. They are also requested to avoid travelling o­n foot board, roof top of locals and not to board extremely over crowded trains. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

Press Release by Central Railway

Due to maintenance work Mega Block on 8 February 2015
Tagged on:     

One thought on “Due to maintenance work Mega Block on 8 February 2015

Leave a Reply

Your email address will not be published. Required fields are marked *