Site icon IRCTC NEWS

Mega Block on main line Sunday 3rd April 2016

Mega Block on main line Sunday 3rd April 2016

As pr Press Released by CR,

Thane – Kalyan Dn Fast Line From 11.00 AM TO 3.00 PM

Down fast line services leaving Chhatrapati Shivaji Terminus Mumbai from 9.38 am to 2.25 pm will halt at Ghatkopar, Vikhroli, Bhandup and Mulund stations in addition to their respective scheduled halts. Dn fast line services beyond Thane will be diverted o­n Dn slow line between Thane and Kalyan stations halting at all stations and will arrive destination 20 minutes behind schedule.

Up fast line services leaving Thane station from 11.22 am to 3.28 pm will halt at Mulund, Bhandup, Vikhroli, Ghatkopar and Kurla stations in addition to their respective scheduled halts and will arrive destination 15 minutes behind schedule.

All Dn and Up slow locals leaving / arriving Chhatrapati Shivaji Terminus from 11.00 am to 5.00 pm will arrive destination 10 minutes behind schedule.

Dn Mail/Express trains departing Thane from 11.21 am to 14.43 will be diverted o­n Dn slow line between Thane and Kalyan stations and will run 20-30 minutes behind schedule.

Note: NO MEGA BLOCK o­n HARBOUR LINE

Read Press Released

Mega Block on main line Sunday 3rd April 2016
Exit mobile version