Site icon IRCTC NEWS

Mega Block o­n 20th Sep 2015 due o maintenance work

Mega Block o­n 20th Sep 2015 due o maintenance work

Central Railway will operate Mega Block o­n its suburban sections for carrying out maintenance work o­n 20.9.2015: –

THANE – KALYAN DN FAST LINE FROM 10.30 AM TO 3.00 PM

Down fast services leaving Chhatrapati Shivaji Terminus Mumbai from 9.37 am to 2.25 pm will halt at Ghatkopar, Vikhroli, Bhandup and Mulund stations in addition to their respective scheduled halts. Dn fast services beyond Thane will be diverted o­n Dn slow line between Thane and Kalyan stations halting at all stations and will arrive destination 20 minutes behind schedule.

Up fast line services leaving Thane station from 10.46 am to 3.28 pm will halt at Mulund, Bhandup, Vikhroli, Ghatkopar and Kurla stations in addition to their respective scheduled halts and will arrive destination 15 minutes behind schedule.

All Dn and Up slow locals leaving / Arriving Chhatrapati Shivaji Terminus during 11.00 am to 5.00 pm will arrive destination 10 minutes behind schedule.

Rescheduling of Express Train – 16345 Dn Netravati Express scheduled departure 11.40 am o­n 20.9.2015 is rescheduled to leave Lokmanya Tilak Terminus at 2.30 pm.

MASJID-CHUNABHATTI & VADALA ROAD-MAHIM BOTH UP AND DN HARBOUR LINES FROM 11.30 AM TO 3.30 PM

However, Special services will be run between Panvel and Kurla (Platform No.8) during the block period.

Harbour line passengers are permitted to travel via Main Line and Western Railway from 10.00 am to 6.00 pm.

Due to these blocks, suburban trains are likely to be more crowded than usual. Passengers are requested not to take any risks while travelling.

Press Release

Mega Block o­n 20th Sep 2015 due o maintenance work
Exit mobile version