Engineering works in Pen – Kasu – Nagothane – Roha sections.

Central Railway will operate Traffic Block o­n Friday 9.1.2015 from 11.50 hrs to 16.20 hrs for carrying out various engineering works in Pen – Kasu, Kasu – Nagothane and Nagothane – Roha sections.

Repercussions-

Partial Cancellation o­n 9.1.2015

  1. Train No. 71089 Diva – Roha Diesel Push-Pull passenger leaving Diva at 09.10 hrs will run upto Pen. (Remain cancelled between Pen and Roha)
  2. Train No. 71096 Roha – Diva Diesel Push -Pull passenger will run Ex Pen at 16.24 hrs. (Remain cancelled between Roha and Pen)

 

Rescheduling Of Trains o­n 9.1.2015  

  1. Train No. 16345 Lokmanya Tilak Terminus – Thiruvananthapuram Netravati Express scheduled departure 11.40 hrs is rescheduled to leave at 14.20 hrs.
  2. Train No. 10111 Chhatrapati Shivaji Terminus Mumbai – Madgaon Kokan Kanya Express scheduled departure 23.05 hrs is rescheduled to leave at 00.20 hrs (on 10.1.2015)

 

Regulation of Trains o­n 9.1.2015 – The trains will be regulated tentatively depending upon the train running position.

DOWN TRAINS –  Train Nos.19262 Porbandar-Kochuveli Express, 12619 Lokmanya Tilak Terminus – Mangalore Matsyagandha Express, 50103 Dadar – Ratnagiri Passenger and 12201 Lokmanya Tilak Terminus –  Kochiveli Garib Rath Express will be regulated between Jite/Pen during the block period and will be handed over at Roha by 45 minutes to 4 hrs behind schedule .

UP TRAINS – Train Nos. 16346 Thiruvananthapuram – Lokmanya Tilak Terminus Netravati Express, 12431 Thiruvananthapuram – H. Nizamuddin Rajdhani Express, 50106 Sawantwadi – Diva Passenger, 10104 Madgaon – Chhatrapati Shivaji Terminus Mandavi Express, 22907 Madgaon – Hapa Express, 19259 Kochuveli – Bhavnagar Express, 12052 Karmali – Dadar (T) Jan Shatabdi Express will regulated at Roha and between Pen – Roha section and will arrive destination late by 40 minutes to 3 hrs 25 minutes behind schedule.

Passengers are requested to bear with administration for the inconvenience caused.

Click Here for Read Press Release

Engineering works in Pen – Kasu – Nagothane – Roha sections

3 thoughts on “Engineering works in Pen – Kasu – Nagothane – Roha sections

Leave a Reply

Your email address will not be published. Required fields are marked *